Temporary Road Closure, The Ridgeway

The Ridgeway Frodsham outside Fox Hill Barns will close on 13 March 2017 for a maximum of five days.

Notice is hereby given pursuant to the provisions of Section 14 of the Road Traffic Regulation Act 1984 the effect of which will be to prohibit traffic on the following lengths of roads in Frodsham Ward to enable road closure for the disconection of old lead supply and replacement with new connection works to be carried out by Gallagher Ltd.

The Ridgeway

Nothing in the Order shall prevent driving upon the said lengths of road of any vehicle which is being used for the conveyance of persons goods or merchandise to or from any premises situate on or adjacent to the lengths of road or in connection with agriculture building construction works of repair and the like or use in an emergency of vehicles for fire brigade ambulance or police purposes. A through route will not always be available and any vehicles not requiring access to properties on the length of road should use alternative routes.

The closure will come into force on 13th March 2017 and will be in force for a maximum of five days. It is anticipated that the work will last for approximately 3 days.

For diversion route, please see plan below.

Diversion map

Kieran Collins (Ref TRO 1493)
Place Operations
Highways Office
Phoenix House
Clough Road
Winsford
Cheshire CW7 4BD
Tel: 0300 123 7036
Email: engvr@cheshirewestandchester.gov.uk