Temporary Road Closure – Top Road, Frodsham

Summary

Top Road, Frodsham will be closed on Monday 18th March 2024 to enable utility works to be carried out by United Utilities Water

Cheshire West and Chester Borough Council
Road Traffic Regulation Act 1984
Temporary Road Closure

Top Road in Frodsham

Notice is hereby given pursuant to the provisions of Section 14 of the Road Traffic Regulation Act 1984 the effect of which will be to prohibit traffic on the following lengths of roads in Frodsham to enable utility works, works to be carried out by United Utilities Water.

Top Road, Frodsham

Nothing in the Order shall prevent driving upon the said lengths of road of any vehicle which is being used for the conveyance of persons goods or merchandise to or from any premises situate on or adjacent to the lengths of road or in connection with agriculture building construction works of repair and the like or use in an emergency of vehicles for fire brigade ambulance or police purposes. A through route will not always be available and any vehicles not requiring access to properties on the length of road should use alternative routes.

The closure will come into force on 18th March 2024 and will be in force for a maximum of five days. It is anticipated that the work will last for approximately 4 days.

For diversion route, please see plan below

Top Road road closure alternative route map during utility works by United Utilities 18 03 2024

Highways Manager (Ref TRO7803)
Transport and Highways Service
Highways Office
Guilden Sutton Lane
Guilden Sutton
Chester
Cheshire
CH3 7EX

Tel: 0300 123 7036
Email: highways@cheshirewestandchester.gov.uk

6th March 2024